- Replaced forced air heat (energy efficient)
- Installed Central Air (energy efficient)
- Replaced dishwasher
- Replaced garbage disposal
- Removed wall paper in dining room
- Removed wall paper in kitchen
- Removed wall paper in bathroom
- Painted kitchen neutral
- Painted living room neutral
- Painted dining room neutral
- Painted hall & entry neutral
- Painted bathroom neutral to match tile
- Painted bedroom with brown carpet neutral
- Painted top 1/2 of bedroom with blue carpet neutral to match wall paper bottom
- Replaced wall border in bedroom
- Painted lower level family room, hallway, entryway & bedroom neutral
- Installed bedroom door in lower level
- Replaced baseboard in bathroom
- Replaced toilet in bathroom
- Replaced sink faucet in bathroom
- Replaced tub faucet & shower head
- Tore down existing tile in bathroom (tub surround)
- Installed three piece tub surround in bathroom
- Sanded & refinished vanity in bathroom
- Installed programmable thermostat
- Removed door at bottom of stairs & opened stairwell
- Replaced smoke detector
- Replaced light fixtures in dining room, entry way, hallway, bathroom & bedrooms
- Installed additional railing & stained to match (was unsafe)
- Fixed electrical outlets in living room, dining room & master bedroom
- Installed laminate hardood floor in kitchen
- Added insulation to attic throughout home
Inside Updates
We moved in September 2005. Since then we have completed the following:
Subscribe to:
Posts (Atom)